About FlexStart 02

FlexStart 02 is the second manufacturing, warehousing and administrative building from the FlexStart family developed by Klaipėda FEZ. It can be adapted to individual client needs within 1–2 months.

The FlexStart initiative was launched by Klaipėda FEZ management company in 2017. At the time, it received the world’s only award from Financial Times’ FDI Intelligence division for quick launch. Following the strong success of the first FlexStart building, Klaipėda FEZ developed the second project of this building family in 2021–2022.

Need speed? Here you go!

In today’s world, the speed of launch is becoming perhaps the most important criterion when choosing a base of operations, and every month saved can make a big difference.

Klaipėda FEZ launched the FlexStart project after thorough market analysis and discussions with dozens of existing and potential investors. FlexStart was designed with the most common needs of clients in light or assembly industry, logistics, trade, and other sectors in mind: ceiling height up to 6 m, all necessary utilities, access roads, warehousing infrastructure, administrative premises, the option to create staff leisure areas, and more.

FlexStart is also a solution for those seeking temporary business premises: start here right away while your permanent facility is being built.

FlexStart 02 technical specifications:

  • Total area: 8,500 sq. m
  • Minimum leasable area: 500 sq. m
  • Ceiling height at the lowest point: up to 6.5 m
  • Access: gates or ramps
  • Address: Pramonės St. 29, Klaipėda

Best suited for:

  • Light industry
  • Assembly industry
  • Warehousing
  • Administrative activities
  • Retail
  • And other sectors

What can we adapt to your needs?

In the office and staff area:

Area, layout, finishing level

In the production and warehouse area:

Internal engineering systems: electrical installation, ventilation, air extraction, water and wastewater systems, compressed air systems, production workplaces and technological premises, floor load capacity

The fastest way to start operations!

Time from signing the contract to beginning operations:

  • Greenfield investment: 1-3 years
  • Acquisition of a company: 6-18 months
  • Renovating an old building: 6-12 months
  • Land plot with an approved construction permit: 6-9 months
  • FlexStart: 1-3 months